Sl. No. |
Services Provided by the ULB |
Time limit for providing service by the ULB |
1 |
Sanction of Building Plan: |
|
1.1 |
Approval of Site Plan and building plan for the residential building having height of 14.5 meters or above |
60 days. |
1.2 |
Sanction of Site Plan and building plan of residential buildings having height of less than 14.5 meters |
60 days. |
1.3 |
Sanction of site plan and building plan for commercial or mixed use building |
60 days. |
1.4 |
Sanction of site plan and building plan for institutional buildings |
60 days. |
1.5 |
Sanction of plan for addition, alteration or repairing of old buildings |
60 days. |
1.6 |
Initiating actions against illegal buildings/ building activities. |
15 days. |
2 |
Birth and Death Registration: |
|
2.1 |
Issuance Of Birth and Death Certificate |
Within 3 days after receiving report from the concerned Health centre/ Hospital/ Nursing home- If reported within 21 days from occurrence of Birth and Death |
2.2 |
Birth Certificate In Case of domestic birth or death |
7 days after receiving report from the concerned Health centre/ hospital/ Nursing Home- If reported within 21 days from occurrence of Birth and Death. |
2.2 |
Issuance Of copy Of Birth and Death Certificate |
Within 7 days, if recorded after the Birth and death. |
2.3 |
Issuance of Cremation Certificate |
At the time of cremation from the crematorium/burial ground, if cremate or buried, as the case may be, in a crematorium/ burial ground of the urban local body. |
2.4 |
Correction of records related to Birth or death certificate |
15 days |
3 |
Enlistment of profession Trade and calling and other licences: |
|
3.1 |
New Enlistment Certificate |
30 days. |
3.2 |
Renewal |
10 days. |
3.3 |
Registration Of cart, carriage etc. |
15 days. |
4 |
Assessment: |
|
4.1 |
Assessment of new holding, partition, change of name / correction of records |
60 days. |
4.2 |
Issuance of any type of certificate or certified copy |
60 days. |
4.3 |
Licence for advertisement |
45 days. |
4.4 |
Licence of private market |
60 days. |
5 |
Conservancy: |
|
5.1 |
Garbage cleaning |
2 days. |
5.2 |
Removal of animal carcass |
1 day. |
5.3 |
Cleaning of drains |
7 days. |
5.4 |
Cleaning of chocked drain |
2 days. |
5.5 |
Cesspool tank wash |
10 days. |
5.6 |
Cleaning of hydrants |
7 days (except in the urgent occasions of water logging) |
5.7 |
Cleaning of grade after receipt of special cleansing charge. |
1 day. |
5.8 |
Removal of materials dumped on the public thoroughfare |
Within 2 days from the date of expiry of term, as determined by the urban local Body, of the owner of such material to remove |
6 |
Electric: |
|
6.1 |
Replacement Of defective Street lamp and repairing (Minor) |
7 days. |
6.2 |
Installation of new Street light |
7 days from the date of completion of installation of poles and connection by the electric supply agency |
4 |
Public Works: |
|
7.1 |
Repairing work o public thoroughfare, or providing temporary thoroughfare till repairing of the road, to avoid any imminent danger on life and property of public |
7 days. |
7.2 |
Repairing of drains |
2 to 7 days depending on urgency. |
7.3 |
Repairing / removal of street Furniture |
2-7 days depending on urgency |
7.4 |
Repairing of bridges/ culvert or providing temporary thorough fare over any water course till repairing of the bridge/ culvert. |
15 days. |
7.5 |
Restoration of road, drain, culvert etc. After installation/ repairing of water supply/ electric/ telephone or lines of other utilities lying under or beside such road/ drain /culvert etc. |
15 days. |